Repeated jams or lost output
Investigate where and when interruptions occur, whether the issue changes with bulk level or component batch, and how the line recovers after each stop.

Review the full path from bulk loading to machine hand-off, identify the actual causes of lost production and prioritise practical corrective work.
A parts feeder audit reviews the complete operating system: incoming component condition, hopper and bulk level, feeder drive and tooling, tracks, sensors, escapement, controls, guarding, downstream demand and operator recovery. The objective is to distinguish root causes from symptoms such as repeated jams, unstable output, excessive tuning, noise, marking or lane starvation. The audit should produce evidence, an agreed baseline and prioritised actions rather than a generic recommendation to replace the machine.
A feeder may appear to be slow because the hopper repeatedly overfills it, the downstream machine does not request parts soon enough, queue pressure destabilises the outlet or component dimensions have changed. Increasing drive amplitude can temporarily move more parts while making orientation, wear and noise worse. A structured audit observes production states and traces the symptom through the complete feed path.
Where data exists, the review should compare accepted output, stoppage duration, fault history, changeover performance and component batches. Where data is limited, simple time studies and controlled tests can establish a useful baseline. The audit also records approved settings, sensor positions, wear, loose components, access restrictions and operator workarounds that may not appear in the machine manual.
The resulting actions may include cleaning and maintenance, replacement tooling, sensor changes, hopper-level control, guide or escapement adjustment, PLC sequence changes, operator training, format-control improvements or a more substantial refurbishment. Recommendations should be ranked by production impact, risk and evidence so the customer can decide what to implement first.

An audit is appropriate when the equipment still has a viable core function but production performance, recovery or changeover is no longer under control.
Investigate where and when interruptions occur, whether the issue changes with bulk level or component batch, and how the line recovers after each stop.
Compare the documented setup with actual practice, identify uncontrolled adjustment and define recipes, gauges or change parts that improve repeatability.
Review demand, buffer, part-present, full-track, fault and restart logic where mechanically capable equipment is being limited by handshake or control behaviour.
The audit should reproduce normal variation and capture facts before adjustments change the evidence.
Record accepted output, settings, part level, component batch, stoppage location and machine demand during a representative production period.
Check bulk storage, metering, feeder, tooling, tracks, guides, sensors, escapements, conveyors and final presentation—not only the most visible jam point.
Review drawings, approved samples, coatings, mould cavities, suppliers, packaging and contamination to determine whether the input part has changed.
Confirm line signals, timeouts, restart conditions, alarm messages and whether operators have a clear response after a missed part or downstream stop.
Worn parts and loose settings should be corrected before concluding that the original feeder concept is unsuitable. Conversely, repeated repair should not hide a fundamental geometry problem.
Each recommendation should state the evidence, expected operational benefit, implementation risk and how success will be checked after the change.
Production records and representative parts help the review focus quickly on the conditions that matter.
| Machine information | Original drawings, manuals, control backups, approved settings, previous modifications and service history. |
|---|---|
| Production symptoms | Jam location, frequency, lost time, affected formats, operator actions and whether the issue is gradual or sudden. |
| Component history | Current and historic samples, drawings, supplier or mould changes, coating, oil, packaging and known difficult batches. |
| Output demand | Required accepted rate, actual sustained rate, machine cycle, buffer and time lost to starvation or blockage. |
| Changeover records | Format matrix, settings, change parts, average setup time and first-pass success after changeover. |
| Controls data | Alarm history, part demand, sensor status, recipes, speed references and communication with the downstream machine. |
| Site constraints | Production access, safe isolation, cleaning, working hours, samples available and permission for controlled tests. |
| Success criteria | Target accepted output, reduction in interruptions, changeover result, damage limit and verification period after work. |
The audit report should distinguish immediate housekeeping or settings actions from replacement parts, control modifications, retooling and capital options. For each selected action, repeat the baseline measurement under comparable production conditions. This prevents an apparent improvement being attributed to a different component batch, lower demand or temporary operator attention.
Observation during normal production is valuable, but some checks need safe isolation or a controlled test. The visit plan should protect production while allowing access to the important feed-path components.
No. Some issues can be corrected through maintenance, component control, sensor position, bulk-level management, settings or PLC sequence. The purpose is to identify proportionate actions.
A review of third-party equipment may be possible where access, documentation, safety and technical scope are appropriate. Any modification recommendation remains subject to detailed engineering and responsibility agreement.
Record stoppage location and duration, component batch, feeder settings, format, hopper level and operator action. Photos or short videos of recurring behaviour can also be useful.
Agree a baseline and target such as accepted parts per minute, stoppages per shift, recovery time or changeover result. Repeat the same measurement after corrective work over a representative production period.
Send a part photo or drawing, the target rate and the required orientation. We will recommend the most suitable starting point.